Saying" when Kazuo, Mo open" war machines, so, too, the core components of good care, the whole machine efficiency is improved. High pressure fan is assembled on various equipment on the key mechanical components, to do the maintenance work can not only prolong the service life, and can improve work efficiency, save cost, the following will be described in detail the high pressure fan maintenance program.
1, maintenance before disconnecting high-pressure blower power, and hung signs.
2, hand-cranked rotating fan blades rotate, observation, adjust the belt tension or coupling gap and to moderate.
3, check the joint face gasket and packing, replace if necessary.
4, clean fan, casing and motor outer surface, the wind leaf surface oil pollution more, to use detergent soak scrub.
In 5, the rotating parts and lubricating oil (grease ), adjustable air valve driving mechanism of flexible and reliable action.
6, detection of motor winding insulation resistance, fastening power line wiring terminals, to check the electrical grounding is good.
7, check the high-pressure fan control cabinet electrical is intact, the fastening of the wiring terminal.
8, check the air valve driving mechanism is flexible and reliable, and has no damage, wire joint fastening is good.
In 9, closing the high pressure fan main power supply, check the power indicating whether normal.
10, to adjust the belt pulley and the belt.
In 11, the boot test run for half an hour, to observe the instrument indicator should be normal, operating sound. |