With the rapid development of the printing industry, printing factory in constant increase, also in the unceasing expansion, the competition is becoming increasingly fierce, the production of the product coessential change, have to let the enterprises by reducing costs to profits. The printing machine is the production of the main tool, therefore," how to arrange the printing machine maintenance time to reduce the cost of production " has become a hot topic related enterprises. Through the investigation of efficient production printing practices, which can be reference for passage way.
For a" efficient operation" approach produces good prints as the goal in the printing business, printing equipment maintenance is essential. So the maintenance time is many? According to the old experience, is generally 4 hours per week. Nowadays however, printing machine running speed and the extension of working hours, 4 hours of maintenance time is obviously not enough. As far as we know, in today's highly efficient production printing workshop, a eight color printing machine weekly repair maintenance time to assign at least 8 -- 10 hours.
In addition, for some main printing equipment, every 6 months to do a comprehensive printing quality detection is a very reasonable request. Don't forget: a careful adjustment, and there is no good repair and maintenance of printing machine service life will be reduced obviously. According to estimation, a sheet-fed printing machine during the life span is 1.5-4 billion sheet printing printing. Then the printer to print many, depends on how to maintenance the machine.
In the implementation of equipment maintenance and management measures of poor printing factory, it is not difficult to find them for each printing machine has a long list of maintenance project list, list has 30-40 maintenance records. Because in the printing machine normal operation prior to the cleaning work, as a result, prepress adjusting operation takes up more time, machine repair time and frequency time increase. In such a printing workshop, failure is common. The efficient production workshop, public maintenance item list only 1-3. This formed the working efficiency of the great contrast. This contrast caused by many reasons, do not be willing to spend money in the machine parts is one of them, for example, in the screen printing machine is positioned high pressure fan, one have to protect the quality of high pressure fan can ensure the printing of highly accurate and precision, ensure the printing efficiency.
To expect to improve the equipment maintenance management of printing factory, we give the following recommendations:
1, to develop a 5S cleaning plan;
2, each piece of equipment in a prominent spot on a piece of paper;
In 3, when every problems can be solved through it, but to keep the list to retain and posted, so the crew saw hope.
Maintenance of machine time arrangement is very important, at the appropriate time to give proper care, not only can play to extend the service life of the machine time, reduce production cost is an effective way to. |